Newsletters

PipelineSOLUTIONS

Read the latest issue of the Pipeline Solutions newsletter here. To receive these in your in-box every month, please complete the form to the right and submit.  

October 2021 - Volume 16, Issue 10
September 2021 - Volume 16, Issue 9
August 2021 - Volume 16, Issue 8
July 2021 - Volume 16, Issue 7
June 2021 - Volume 16, Issue 6
May 2021 - Volume 16, Issue 5
April 2021 - Volume 16, Issue 4




News Items

PLM releases new pipelayer solution - the 71H

by User Not Found | Jun 09, 2014
CYPRESS, TX – PipeLine Machinery International (PLM) announces the release of the 71H pipelayer. With the support of Caterpillar® and the engineering expertise of Vanguard Equipment Inc., the challenge was met to create a utility-capacity pipelayer in the Tier 4 Interim/EU Stage IIIB class, designed for lifting 27 215 kg (60,000 lb.) and engineered to meet the most exacting standards in the world.

Features include:

  •  Standard electro-hydraulic tractor control, dedicated hydraulics, differential steering and machine control systems.
  • Boom and hook draw works are driven by independent hydraulic winches.  
  •  The compact design of the counterweight provides maximum lift capability and optimum weight distribution.  
  •  The drawbar is able to accommodate a wide range of attachments.
  •  Roll Over Protection Structure (ROPS) and Quick Drop function on load line control.
  •  Heavy duty undercarriage. Standard 600 mm (23.6 in.) single grouser shoe, LGP configuration.
  •   Standard 6.1 m (20 ft.) boom with large box section.

The company’s worldwide activities are currently supported through the corporate office in Cypress, Texas, USA; Edmonton, Alberta, Canada; The Hague, Netherlands; Beijing, China; and Melbourne, Australia.

 

For further information, check out the 71H page or contact your account manager.